£ $
EN RU

Investment project with expanded infrastructure of Antalya

ID 1477
City, district Antalya
District Altintas
Layout 1 + 1, 2 + 1
Area 78, 80, 100
To the sea 4500 m
Includes Residence Permit +
Property type Apartment
Payment by installments +
0

Price

Infrastructure
Residence Permit
Citizenship
Elevator
Playground
Pool
Gazebo rest zone
Landscape design
Parking
Security cameras

The investment project is located 10 minutes from the city center and 5 minutes from the airport. (This project is exposed to noise in very rare cases, because the project location is outside the take-off route of the aircraft and is only within the take-off route of private planes and helicopters, and this shows that it is in an advantageous position compared to other projects in the same region). One of the most beautiful
The advantages of the location is that it is located 5 minutes from Lara Beach, one of the exclusive beaches in Antalya. Since it is a developing region, the return on investment is fast.

The project consists of 3 blocks and 69 apartments with a total area of 5,405.50 m2 on a plot of land. Blocks A and B have 3 apartments on each floor, 2+1 on the side facades and 1+1 in the middle. In block C on each floor there are 3 apartments 1+ 1.
And the BLOCK FLOOR + 7 FLOORS
B BLOCK FLOOR + 6 FLOORS
C BLOCK FLOOR + 7 FLOORS
The project has social areas on the territory – these are common areas where you can use an outdoor swimming pool, a children's pool, an indoor pool, a Turkish bath, a sauna, a gazebo, a playground, a walking path, a fitness center and a basketball court.
Technical characteristics: architectural landscape, automated
lighting of buildings and gardens, round-the-clock security and video surveillance system, water tank and hydraulic system, generator and parking.
Apartment features: air conditioning infrastructure in each room, steel door, lacquered interior doors, MDF High Gloss kitchen cabinets, F/O infrastructure, central television system, video intercom, built-in headset, electric blinds, elevator call button, heating system infrastructure, natural gas infrastructure.

Completion of construction in September 2023. Construction has begun.

Check the relevance of the offer with the specialists of our company.

Object selection We will contact you within 15 minutes
By clicking the "Send" button, I confirm my legal capacity, I consent to the processing of my personal data in accordance with the Privacy Policy
}