Investment project in Erdemli end 30.09.2024
Investment project in Erdemli end 30.09.2024
ID | 1980 |
City, district | Mersin |
District | Erdemli |
To the sea | 300 m |
Layout | 1 + 1 |
Area | 60 |
Property type | Apartment |
Sea view | + |
Price
Sales are open in a new investment project of a residential complex located in Erdemli district, Mersin city. Erdemli is one of the most promising areas of Mersin with urban infrastructure, a tourist atmosphere and luxurious beaches, as well as many modern new buildings and residential complexes.
The project is located on a land plot of 1930 sq.m and consists of 48 apartments 1 + 1, zero plus 12 floors, 4 apartments on each floor. Net area of side apartments 61.55 m2, gross 90 m2, middle apartments 60.65 m2, gross 90 m2. Also 1+1 apartments with a separate kitchen. The apartments in the project see the sea from the 3rd floor. A short distance to the sea 300m will make your stay even more comfortable. Near the project there are shops "A101", "Bim" and "Shock" which will allow you to live without constant and long trips for groceries.
GENERAL CHARACTERISTICS:
1. Heat-resistant pumice is used.
2. Elevator.
3. Fire detector inside the building.
4. Complete generator.
5. Natural gas system (including honeycombs).
6. Central satellite system.
7. Wide landscape area.
8. Hydraphore.
9. Entrance door of the building with a photocell.
10. Security.
INTERIOR FEATURES:
1. Suspended ceiling.
2. Kitchen cabinet.
3. Wardrobe
4. Wardrobe for clothes.
5. Bathroom cabinet.
6. Kitchen counter.
7. Steel front door.
8. Double-glazed windows for PVC windows.
9. Imported silicone based paint.
10.1st class Plumbing.
11.1-th class Shower cabin.
12. Grooved parquet 8 mm.
13. Glass balcony railings.
FEATURES OF THE SOCIAL ZONE:
1. Entrance to the building (foyer) waiting area.
2. Open parking.
3. Outdoor swimming pool.
4. Outdoor children's playground.
5. One barbecue area and gazebos.
6. Path for a walk.
7. Basketball court.
Down payment 50% possibility of payment by installments for 15 months.
Completion of construction on 09/30/2024.
Check the relevance of the offer with the specialists of our company.